+86 0516 85628519

CNC machining large parts requires more than a machine with enough travel and table capacity. When a heavy welded frame must be lifted, turned, or repositioned between machining setups, the handlin...
CNC machining fixture design for long welded structures must balance three needs: accurate location, stable support, and controlled clamping. The fixture must resist cutting forces without bending ...
Plate CNC machining for heavy equipment should be specified by the functional features that require machining, not by assuming every cut edge or surface needs a milling pass. Flame- or plasma-cut s...
CNC fabrication and machining services for heavy equipment frames should be planned as one manufacturing sequence: fabricate the structure, manage welding-related movement, and finish-machine the i...
CNC machining surface finish should be specified from the function of each surface, not by assigning the same roughness value to every machined area. On a large welded frame, a mounting pad, bearin...
How much does CNC machining cost for a heavy welded part? A useful budget combines initial preparation, production-batch setup, recurring work per part and the agreed delivery scope. An hourly rate...